As a rule, removal and loading for transport are handled by wheel loader of front loader. While this work is in progress, air is continuously sucked out at the rear of the shed, so as to ensure optimal working conditions.
The loading of the dried material onto lorries may be carried out outside the shed, or in a special loading bay. It is also possible to integrate an optional silo-truck loading station in the rear of the shed.
In general, dried sludge can be stored temporarily in the sheds at any time, even during drying operations. This makes for considerable flexibility in removal and further use.